West Shore Expressway, Staten Island, NY
Owner: The New York State Department of Transportation
Traffic Count: 71,000 ADT
Work Window: 8 hours (for two lanes) at night only
The project included repair of both two and three lanes of approach slabs for four bridges. Normal weight concrete slabs were 11 ½” thick and 9 ½” thick separated by an asphalt pressure relief joint. Slabs were of variable length of horizontal and vertical curvature.
< return to projects