I-88 Reconstruction, Oak Brook, IL
Super-Slab® Provides Cost Effective Maintenance of Traffic
Super-Slab® Provides Cost Effective Maintenance of Traffic
Super-Slab® Enhances Public Safety While Making an Emergency Repair
With Only One (1) Lane Closed During Repairs, Super-Slab® Keeps Philadelphia Traffic Moving
Precast Pavement is the Right Solution at the Right Time for Failed Transverse Joints
Standardized Slab Sizes Incorporated into Utah’s Pavement Preservation Program
Contractor Averages Installing 10 Slabs per Nightly Five (5) Hour Closure
Precast Pavement Used to Repair Faulty Composite Pavement Section
Super-Slab® Used for Full Depth Repair
Commuter Traffic Keeps Flowing With Minimal Interruption During Six (6) Hour Nightly Closures
Super-Slab® Provides a Value Engineered Solution for Full Depth Repair and Restricted Lane Closures