I-88 Roadway Reconstruction, Aurora IL
Owner: The Illinois State Toll Highway Authority
Traffic Count: 63,000 ADT
Work Window: 8-hour nighttime closures
The project consisted of installation of 3 precast slabs, one in each westbound lane and the shoulder of the Reagan Memorial Tollway (I-88) to span a failed corrugated culvert. The emergency repair was intended to be in place for approximately one year until that section of the Tollway was reconstructed as part of a major bridge and roadway reconstruction project.
< return to projects